PROJECTS
Our services are purchased by corporations, universities, and organizations around the Pacific Northwest.  Below is a small representation of the clients we have provided our services for.
 

Ashwood Commons, 909 112th Ave NE, Bellevue
2-Phase mixed-use development located in downtown Bellevue.  Phase-1 consisted of a 25-story multi-family residential building, while Phase-2 consisted of two 10-story office towers.  Soil nail shoring was utilized for the approximate 40 to 50-foot deep excavation.  Groundwater required the installation of temporary dewatering sumps and permanent under slab drains.  See photos in gallery.



7700 Central, Mercer Island
This commercial and residential mixed-use development in downtown Mercer Island occupies an entire city block.  The four above-ground buildings are supported over a common parking garage that occupies the full extent of the property.  Soldier pile shoring was required for all four sides of the excavation to restrain the surrounding streets while the basement excavation was made.  Portions of the shoring required tieback anchors, some of which extended into the Interstate 90 right-of-way.  Poor soil conditions necessitated over-excavation and replacement with imported rock fill for a portion of the foundations.  See photos in gallery.



Driveway & Single Family Residence, North Bend
The residence on this project was constructed on a relatively small bench located in the middle of steep slope areas in the North Bend area of King County.  The primary geotechnical consideration for this development was construction of a paved driveway that had to cross very steep slope areas.  The presence of old slide debris, including large boulders, overlying hard, intact bedrock required the use of micro-piles to support the driveway as a structural, reinforced concrete deck.  Soil nail shoring was utilized to temporarily retain the deep cut necessary for the house.  Most of the residence was supported directly on intact bedrock, however, portions had to be carried on micro-piles extending through remaining slide debris to reach the bedrock. 




Repair of Landslide, Mercer Island
A Mercer Island residential property was affected by a landslide following heavy rains.  This slide came close to undermining an existing storm catchbasin, an outfall line, and a modular block retaining wall.  The slide was repaired using an anchored pipe pile retaining wall.  This retaining wall was backfilled primarily with geofoam to reduce the loads that the wall had to withstand.  See photos in gallery.



Artsbrewery, Seattle
The Rainier Brewery, which ceased operations in 1998, includes approximately 25 buildings that span a quarter of a mile along Airport Way South.  The plan is to turn the complex into a multi-use development that provides affordable live/work and community space to artists and homes for several arts and nonprofit organizations, and continues to serve as Tully's headquarters.  We have been providing geotechnical services on various areas of the complex since 2003.  Most notably, engineering  services prior to, and through construction of a new retail coffee shop at the northwestern corner of the complex, a new roadway that extends along the eastern edge of the complex, and a new storage facility at the southeastern corner of the complex.  The geotechnical engineering challenges on the projects is directly tied to the geologic setting.  Loose soils required the use of pile foundations, sloping conditions made for several retaining structures and excavations, some as much as 30 feet.  Retaining structures range from soil-nail walls and soldier-pile shoring to large conventional concrete walls.  Currently, we are involved with providing geotechnical engineering observation and testing services for the storage facility.  Monitoring of I-5, the existing site buildings and the SPU tunnel is also underway.  See photos in gallery.